OMNIA Coverage - Cascade Tunnel
PBE Axell were initially contracted in April 2020 to design, install and commission a communications system throughout the Cascade Tunnel in the Cascade Mountain Range located in Washington, USA.
PBE Axell were initially contracted in April 2020 to design, install and commission a communications system throughout the Cascade Tunnel in the Cascade Mountain Range located in Washington, USA.
The Cascade Tunnel boasts an impressive combined length of 10.42 miles, solidifying its position as one of the most expansive freight rail tunnels in the United States. Located within the Cascade mountain range, spanning several US states, including Washington, Oregon, and parts of California and British Columbia, Canada. The tunnel serves as a crucial transportation link connecting the eastern and western regions, which are geographically separated by the Cascade Mountain Range. The tunnel facilitates the flow of traffic and transportation between these regions, allowing for efficient rail freight operations and reducing the need for longer surface routes over the mountains. Its strategic location within the mountain range adds to its significance as an essential route of the transportation infrastructure in the region.
PBE Axell initiated an extensive design process incorporating three meticulous design phases to develop a state-of-the-art, fibre-fed, multi-plexed mini DAS system known as OMNIA. OMNIA represents PBE Axell's cutting-edge solution for railroad tunnel communication and data, seamlessly integrating three systems into one comprehensive platform: positive train control, tunnel and service VHF simplex and duplex voice communications, and distributed power. This advanced system is fully monitored through Vantage.
The improved OMNIA system proved to be more suitable for purpose and less costly than the origial solution with reduced install costs and vastly less required cable. Simplification - Current solution is three separate systems that each require maintenance. Maintainability - Current solution does not monitor or report system health. Serviceability - Current solution requires multiple components to kept on site and is difficult to troubleshoot. Expandability - Current solution does not use up-to-date technology allowing the system to be expanded or new functionality to be added.
OMNIA can be fully monitored through our system: VANTAGE. Vantage provides a full picture of system health in real-time down to component level, providing preventative maintenance opportunity through early identification of potential issues. Alert notifications and accurate location diagnosis result, the implementation of OMNIA brings about a notable reduction in tunnel operation downtime, ensuring enhanced operational efficiency and reliability.
The Cascade Tunnel Project was a major engineering endeavour that involved the construction of a railroad tunnel through the Cascade Mountains. The primary goal of the tunnel’s construction was to create a more direct and efficient route for the Great Northern Railway as the existing route over Stevens Pass posed challenges due to heavy snowfall and steep grades. Construction began in 1925 and was completed in 1929 using explosives, steam-powered drills, and other machinery for excavation. The project involved creating two tunnels, the first one being 7.79 miles (12.53 kilometres) long and the second one (known as the "Big Hole") extending for 2.63 miles (4.23 kilometres).