Cascade Tunnel OMNIA Coverage

OMNIA Coverage - Cascade Tunnel

PBE Axell were initially contracted in April 2020 to design, install and commission a communications system throughout the Cascade Tunnel in the Cascade Mountain Range located in Washington, USA.

PBE Axell In Building Technology  The Challenge

The Cascade Tunnel boasts an impressive combined length of 10.42 miles, solidifying its position as one of the most expansive freight rail tunnels in the United States. Located within the Cascade mountain range, spanning several US states, including Washington, Oregon, and parts of California and British Columbia, Canada. The tunnel serves as a crucial transportation link connecting the eastern and western regions, which are geographically separated by the Cascade Mountain Range. The tunnel facilitates the flow of traffic and transportation between these regions, allowing for efficient rail freight operations and reducing the need for longer surface routes over the mountains. Its strategic location within the mountain range adds to its significance as an essential route of the transportation infrastructure in the region.



The task entrusted to PBE Axell involved the replacement of the previous communications system with a refined and enhanced solution that was easier to maintain and more resilliant, eradicating the prolonged downtime that had plagued the entire tunnel for years resulting in high costs due to down-time. By prioritising improved reliability, the aim was to mitigate the disruptions and inefficiencies previously encountered. Improved system resilience was required with current solutions architecture such that a loss in one dDA caused the entire system to go fail. Improved voice communication quality with current solution using VHF simplex and half duplex low power.

Cascade Tunnel Stevens Pass Diagram

PBE Axell In Building Technology  The Solution

PBE Axell initiated an extensive design process incorporating three meticulous design phases to develop a state-of-the-art, fibre-fed, multi-plexed mini DAS system known as OMNIA. OMNIA represents PBE Axell's cutting-edge solution for railroad tunnel communication and data, seamlessly integrating three systems into one comprehensive platform: positive train control, tunnel and service VHF simplex and duplex voice communications, and distributed power. This advanced system is fully monitored through Vantage.


OMNIA 

PBE Axell In Building Technology  The Benefit

The improved OMNIA system proved to be more suitable for purpose and less costly than the origial solution with reduced install costs and vastly less required cable. Simplification - Current solution is three separate systems that each require maintenance. Maintainability - Current solution does not monitor or report system health. Serviceability - Current solution requires multiple components to kept on site and is difficult to troubleshoot. Expandability - Current solution does not use up-to-date technology allowing the system to be expanded or new functionality to be added.

OMNIA can be fully monitored through our system: VANTAGE. Vantage provides a full picture of system health in real-time down to component level, providing preventative maintenance opportunity through early identification of potential issues. Alert notifications and accurate location diagnosis result, the implementation of OMNIA brings about a notable reduction in tunnel operation downtime, ensuring enhanced operational efficiency and reliability.

PBE Axell OMNIA

Next generation railroad tunnel communication & data

3 systems in 1:

Positive Train
Control

Tunnnel &
Service Voice

Distributed
Power

Your OMNIA system will be fully monitored through our proprietary monitoring system, VANTAGE. This system provides the operator with a full picture of system health in real-time down to the component level, allowing you to see potential issues before they become big problems.

OMNIA 

PBE Axell In Building Technology  The Location

The Cascade Tunnel Project was a major engineering endeavour that involved the construction of a railroad tunnel through the Cascade Mountains. The primary goal of the tunnel’s construction was to create a more direct and efficient route for the Great Northern Railway as the existing route over Stevens Pass posed challenges due to heavy snowfall and steep grades. Construction began in 1925 and was completed in 1929 using explosives, steam-powered drills, and other machinery for excavation. The project involved creating two tunnels, the first one being 7.79 miles (12.53 kilometres) long and the second one (known as the "Big Hole") extending for 2.63 miles (4.23 kilometres).

Share this Post

We use cookies to improve your experience, analyse website traffic, and assist marketing. Click "Accept & Close" to agree to the storing of cookies on your device. Or you can control the cookies you accept by clicking "Cookie Settings". Read more about how we use cookies in our Cookie Policy.

PBE Axell Spider Logo Cookie Settings

Our website & 3rd party services store & retrieve information related to your visit via your browser in the form of cookies. We respect your right to privacy - You can choose not to allow some types of cookies. However, blocking some types of cookies may impact your experience.